** PLEASE DESCRIBE THIS IMAGE **
Cummins Fire PowerLogo Center Image
Spacer
Home Site Map  
 
Red boxes
  Links
Application Installation

Start Up Information

Exhaust Sizing



 

Installation Recommendations
Installation recommendations, and the process to get ready for the initial start up, are contained in section 3 "Operating Instructions" of the O&M manual. Operations & Maintenance manuals are located on the Products page. Select the engine model and then the O&M manual.

The start-up process is explained, and the necessary forms are located, on our start-up page.

Proper drive-shaft alignment is critical to the life of the shaft and u-joints. Refer to CFP drawing number 11537 for proper alignment instructions.

 

 

 

 
 

Blank Space

Home
| Site Map | Privacy Policy and Terms of Use and Disclaimers
 
UL Logo C UL Logo FM Approved
© 2008 Cummins Fire Power, 875 Lawrence Drive, De Pere, WI 54115 U.S.A.
2008 Cummins Inc. All rights reserved. Cummins and its logo designs are trademarks of Cummins Inc.